Chengli Special Automobile Co., Ltd
+86-15826761207
[[smallImgAlt]]
video

Bulk Cement Tank Truck

Dimensions :10150*2550*3880mm
Tank volume :30m³
Transport medium: Bulk cement, dry mixed mortar, fly ash etc

Send Inquiry
  • Description

    bulk cement tank truck

     

    product-790-593

     

    Product features:

    ◆ The angle of the tank fluidized bed has been determined through multiple tests, resulting in faster feeding speed and extremely low residual rate, ensuring faster and more efficient operation.

     

    ◆The curb weight is 14 tons, and the dry mixed mortar volume is 28 cubic meters(36-44 tons). The bulk cement volume is 30 cubic meters( 33-39 tons).

    Note: Different materials have different specific gravities and load capacities.

     

    ◆ Long term spot reserves, available for immediate withdrawal.

     

    Vehicle parameters

    Vehicle model

    CLW5311GFLZZ6

    Total weight (kg)

    31000

    Rated load capacity(kg)

    16900

    Dimensions (mm)

    10150*2550*3880

    curb weight(kg)

    14100

    Chassis configuration

    driving cab

    TX-M cab; Main airbag+auxiliary simple seat, mechanical power supply

    Switch; Electric doors and windows, original factory air conditioning

    Chassis Model

    ZZ1317N326GF1

    number of axles

    4

    Tire Size

    11.00R20

    Number of tires

    12

    Transmission

    9-speed gearbox

    frame(mm)

    Double layer 8+5/300

    Wheelbase(mm)

    1800+3200+1350

    Emission standards

    Euro 6

    Front and rear axles

    11 ton self-adjusting arm double rear axle

    engine

    Heavy Truck 350 horsepower

     

     

     

     

     

     

     

     

     

    Superstructure configuration

    Tank volume(m3)

    bulk cement 30 cubic meters

    Conveying height (meters)

    Greater than 15

    Tank material

    High strength and wear-resistant

    air compressor

    10 cubic meter large air compressor

    safety valve

    full lift

    One-way check valve

    DN65

    intake valve

    DN50

    Climbing stairs

    standard configuration

    Quantity of silos

    2-3

    Conveying distance (meters)

    Greater than 30

    Tank/Head Thickness (mm)

    4/5

    External gas source

    Aluminum alloy valve

    pressure gauge

    Shock resistant and wear-resistant

    Discharge valve

    DN100

    Discharge port

    1 piece

    discharge pipe

    Built in steel wire rubber tube/7 meters long

     

    Attention

    ★Before closing the upper filling port, clean the debris on the sealing surfaces of the upper and lower covers and all moving parts to maintain cleanliness, otherwise it will cause air leakage and hinder movement.

     

    ★ If the sealing ring of the upper filling port is damaged, it should be replaced in a timely manner.

     

    ★ It is strictly prohibited to open the upper filling port when there is air pressure inside the tank, otherwise it will cause danger.

     

    ★Do not use force rods to open or close the upper filling port, otherwise it will cause danger.

     

    Special Reminder

    Bulk cement ash trucks can only transport cement and powdery materials with physical properties similar to cement. Materials with particles and moisture are not allowed to be transported, otherwise fluidized conveying cannot be achieved.

    product-790-593

     

    Operation guide

    ● From climbing the ladder to the top, open the exhaust valve at the rear until the air pressure inside the tank is exhausted.

     

    ●Open the filling cap according to the particle addition position, remove the sealing ring of the filling port, and place it properly.

     

    ● Start loading, after filling, remove the cement ash around the filling port, install the sealing ring, tighten the filling port cover, and close the exhaust valve at the rear.

     

    Unloading operation steps

    ■ Park the vehicle on a flat surface, tighten the parking brake, and then get off the vehicle and turn off 2 (or 3)

    Open the ash discharge butterfly valve and secondary auxiliary blow valve, and open the inlet ball valve of compartment 2 (or 3).

     

    ■ Start the engine, press the clutch, turn on the power take-off switch on the dashboard, and operate the air compressor correctly.

     

    ■ According to different chassis (for electronic fuel injection engines, press the PTO throttle switch button), get off the vehicle and operate the manual throttle at the front end of the tank to adjust the engine speed to 900-1000 revolutions per minute.

     

    ■ Observe the pointer of the pressure gauge and start unloading when it reaches 0.18-0.2Mpa.

     

    ■First, open the secondary blowdown valve, and then open all 2 (or 3) ash discharge butterfly valves.

     

    ■ When the pressure gauge pointer drops significantly, close the ash discharge butterfly valve in the rear compartment and the pressure will rise.

     

    ■ When the pressure gauge pointer drops significantly again, close the ash discharge butterfly valve in the middle compartment.

     

    ■ When the pressure gauge pointer rises to 0.18-0.2, open the ash discharge butterfly valve of the (middle) rear compartment to simultaneously clear the front, middle, and rear double compartments (or three compartments).

     

    ■When the pressure drops to 0.05Mpa, it indicates that unloading is complete, and the throttle lever can be reset to stop the engine and air compressor.

    Hot Tags: bulk cement tank truck, China bulk cement tank truck manufacturer, suppliers, factory, 20000 Liter Chemical transport tanker, howo offroad military cargo truck, Lighting Tower Fire Truck, dongfeng lorry loader crane, refuse collector garbage truck, isuzu drinking water Truck

    Next: No Information

(0/10)

clearall